TOPRE
CULMAN, AL
Cardinal worked with Sankyu USA, Kajima International
and Hitachi Zosen Fukui Corporation to install a four
press tandem line comprised of three 1,000-ton transfer
press units, one 1,500-ton blanker, a complete stack loader
system, a wash unit, ten robots, transfer conveyors, and
automation.
The installation also included the soleplate installation,
fabrication and installation of the pit steel, the bolster
steel and rails, and the multi-pit steel plate covers.
Cardinal was also responsible for subcontracting the
installation of the interconnect wiring, the multi-press
cable tray system, the field fabrication of the high pressure
air system, the hydraulic system, and the pneumatic interconnects.
|